[1]
Taufan, S. et al. 2023. Workload analysis with the full time equivalent method approach to determine workforce required. Jurnal STEI Ekonomi. 32, 2 (Dec. 2023), 211–222. DOI:https://doi.org/10.36406/jemi.v32i02.1371.recovery.